Monday, July 7, 2008

quick post

We now have all the subfloors installed, termites killed, kitchen ceiling leveled, and floor leveled. It's still not much to look at, but we have the bamboo wood floors and tiles in the basement waiting for installation. Tim is in Gordonsville, TN for a school training until Friday night and Laura is supposed to be back in town Tuesday night. Then the countdown begins. We have to be out of the apartment by the end of July so as of today we have 24 days to go. We have at least started packing and have moved some boxes to the basement. It will be really exciting when I can post pictures that shows significant progress. Until then you get to look at our new subfloors and the new concrete in the kitchen (the floor was 2 inches lower in the back.)



Our contractor, Laura.